Skip to content
HeatAlgo
BlogGuides

Before you get a radiant floor heating quote: what to measure and what to ask the contractor

Before a radiant floor heating installation quote: 6 things to measure and ask, from room-by-room heat loss to oxygen-barrier PEX and slab insulation.

Founder of HeatAlgo, author of the calculation engine to EN 12831 and EN 1264

Short answer: before you ask for a radiant floor heating quote, gather your floor plans, what is under each floor, the floor covering you want in each room and what you know about your heating equipment. Then ask every contractor the same six sets of questions below, starting with who calculates the heat loss of each room. Comparing bids is only fair when they cover the same work.

You do not need to pick a tubing spacing before your first conversation with an installer. Start with the rooms you want to heat, the floors you want to keep and the documents you already have. A homeowner on HeatingHelp put the usual starting point plainly: "What questions should I ask a plumber about Radiant heating?" This page answers that question as a checklist.

Copy the six lists into your notes or print this page. Beside each item write ready, to confirm or not applicable, and the name of whoever will confirm what is missing. You can use the checklist without an account or a HeatAlgo purchase.

This guide covers hydronic radiant floor heating: warm water circulating through tubing in the floor. Electric heating mats are outside its scope. You gather and check the inputs; your contractor reviews the proposed design for your house and the selected system before installation.

1. Floor plans, measurements and fixed features

  • A plan for every floor included in the work, with its date or revision.
  • Room names, uses, dimensions and ceiling heights.
  • At least one measured dimension on each plan so its scale can be checked. Note which dimensions come from drawings and which from site measurements.
  • Doors, stairs, kitchen cabinets and island, bathroom fixtures, fireplaces and other fixed features marked on the plan.
  • Walls, doorways or layouts that may still change.

Mark the rooms you want heated and the areas to leave alone. Fixed features are points to discuss with the contractor, not a universal rule for where tubing may go. If a drawing no longer matches the house, flag the difference.

2. What is under the floor, the insulation and the height you have

  • Whether the floor is a slab on grade, a slab over a basement or crawlspace, or a wood-framed floor over joists, if known.
  • Existing layers, insulation material and thickness, backed by drawings, product sheets or photos where you have them.
  • What will be kept, removed or rebuilt, and any known moisture or floor-condition problems.
  • The height available for the complete new floor, finish included, at doors, stairs, thresholds and adjoining rooms.
  • Who will inspect the existing floor and confirm the proposed buildup.

Ask what insulation goes under the slab and at its edges. A contractor who plans to skip it should explain how the heat going down was accounted for, because that is heat the room does not get. Do not choose a system by its advertised panel thickness alone: ask for the full floor buildup and the finished floor height it gives. Leave unknown layers marked to confirm.

Know which kind of system you are being offered. Tubing embedded in a slab or a thin slab is one family. Joist-space, staple-up, plate and panel systems under a wood subfloor are another, with their own output data from the manufacturer. HeatAlgo calculates the first family only and does not calculate joist-space, staple-up, plate or panel systems.

3. Floor coverings and product sheets

  • Your preferred covering in each room: tile, engineered wood, solid hardwood, vinyl, carpet or something else.
  • The manufacturer, exact product and thickness where already chosen.
  • Underlayment and adhesive specifications, where they apply.
  • The supplier's statement that the product suits radiant floor heat, its thermal resistance and any temperature limits or installation conditions.
  • Rooms where you are still choosing between coverings.

Share the product sheets before the design is final, and ask the contractor to check the covering and the floor's heat output together. Why wood and carpet deliver less heat than tile at the same water temperature is explained in the guide to radiant floor heating water temperature. A label saying "suitable for radiant heat" is still a reason to read that product's conditions.

4. Heating equipment and the room-by-room load

  • The existing or planned boiler or heat pump, with model and data sheet if known.
  • Rooms that will keep baseboard, radiators or another kind of heat.
  • Any room-by-room heat loss calculation, with the building details and assumptions it used.
  • Planned changes to insulation, windows, room use or ventilation.
  • Who will check the heat each room needs against what the proposed floor can deliver.

Floor area alone does not describe how much heat a room needs. Ask the contractor for their room-by-room load calculation and keep it with the bid. If there is none, say so and ask who will provide it. Do not guess insulation values or pick a water temperature just to fill a blank.

5. Tubing, manifold, supply water temperature and controls

  • What tubing is proposed, and whether it is oxygen-barrier PEX. Ask for the product name and size in the bid.
  • How the supply water temperature will be controlled: a mixing valve, outdoor reset, or both, and what sets the temperature on a mild day.
  • Possible locations for the manifold, the unit that connects the loops, with room for access and service.
  • Routes from the manifold to each room, with doorways, level changes and other obstacles marked.
  • Rooms you want to control separately, possible thermostat locations and any wiring limits.

Treat your manifold ideas as suggestions until checked. Ask the contractor to include the runs to and from the manifold in each loop's length and to confirm access, connections and controls. Why those runs count is shown in the guide to tubing spacing and loop length, and how the manifold position changes them in where to put the radiant floor manifold. Loop-length limits come from the tubing manufacturer, so ask which limits apply to the tubing quoted.

6. Who designs the loops, what the bid includes, and handover

  • Who calculates the room loads and draws the loop layout, and who reviews them for your house and the selected system?
  • Which drawings, assumptions, tubing specifications, loop lengths and design settings will be documented?
  • Does the bid include floor preparation, insulation, tubing, manifold, controls, connection to the boiler or heat pump, and restoring the floor? What is excluded?
  • Who coordinates the heating contractor, the concrete or thin-slab crew and the flooring installer, and how are changes priced and agreed?
  • Who pressure-tests the tubing before it is covered, following the selected system's instructions, and records the result?
  • Who handles startup, loop flow balancing, a controls check and the initial warm-up the floor construction needs?
  • Will you receive the final layout, loop labels, test and startup records, operating instructions and warranty information?

Keep the answers with each bid so you can compare scope, not just totals. Agree on the checks before work starts: EN 1264-4 provides for a pressure test before the slab is poured over the tubing. Ask your contractor for the instructions that apply to the system you chose instead of copying settings from another product.

Next steps

Prepare your layout in HeatAlgo

Once you have the information, you can prepare a hydronic radiant floor layout for tubing in a slab or thin slab in HeatAlgo's radiant floor heating software. You enter the room loads, check the inputs and review the layout. You can then buy the printable plan and PDF report to discuss with your contractor, who should review the proposed design for your house and selected system before installation.

Start a free radiant floor layout

A HeatAlgo report follows EN 12831-1 and EN 1264, not ACCA Manual J, and is not accepted for permits or rebates.

HeatAlgo newsletter

New guides, HeatAlgo product changes and offers - straight to your inbox. You confirm the sign-up with a link we send you.

FAQ

Frequently asked questions

What questions should I ask a contractor about radiant floor heating?

Ask who calculates the heat loss of each room and whether you get it in writing, what tubing they use and whether it has an oxygen barrier, what insulation goes under and around the slab, how the supply water temperature is controlled (a mixing valve, outdoor reset or both), who draws the loop layout, and who pressure-tests the tubing before it is covered. Write the answers next to each bid so you compare the same scope.

Is it normal for a contractor to skip insulation under radiant tubing?

Treat it as a question, not a detail. Without insulation under the slab, part of the heat the tubing gives off goes down into the ground or the space below instead of up into the room, and the floor needs warmer water to deliver the same output. Ask the contractor what insulation they plan under and at the edges of the slab, how they accounted for the downward loss, and to put that in the bid.

Do I need a room-by-room heat loss calculation before radiant floor heating is installed?

You need to know what each room needs before anyone can say whether the floor can deliver it. Floor area alone does not tell you that: a room with two exterior walls and large windows needs more heat than an interior room of the same size. Ask the contractor for their room-by-room load calculation and the assumptions behind it. If nobody has one, ask who will provide it before the layout is drawn.

Who should design the radiant floor loops?

It can be the installer, the tubing manufacturer's design service or an independent designer. The job title matters less than three answers: who calculates the room loads and the loop layout, who checks that layout against your actual house and chosen system, and who updates it if you change a floor covering or move a wall. Ask for those three names in writing with the quote.

Blog

See also

Guides

Radiant heating glossary for installers: heat loss, U-factor, R-value, delta T

A radiant heating glossary for installers: heat loss, U-factor, R-value, thermal bridges, ACH50, balance point, COP, delta T, outdoor reset and on center.

Guides

Heating glossary for homeowners: what your installer's form asks for

A heating glossary for homeowners: floor plans, sections, window schedules, U-factor, R-value and radiant floor heating - what each is and where to find it.

News

Radiant floor heating from a floor plan: AI draws the sections and loops

Upload a floor plan as PDF, PNG, JPG, HEIC, DWG or DXF, set the scale, and HeatAlgo's AI draws radiant floor heating sections with PEX loop layouts to EN 1264.

Guides

Heat recovery ventilation (HRV) in HeatAlgo (beta): six steps from rooms to the balance and the unit

Design heat recovery ventilator (HRV) systems in HeatAlgo: room airflows in cfm, ducts on floor plans, the unit from EPREL, modes and the air balance.

Guides

Heat loss calculation: what a room-by-room calculation is and what depends on it

A heat loss calculation gives the power a house needs in the coldest hour, room by room, to EN 12831-1. Worked example: 1,100 ft², 15,651 Btu/h.

Guides

How to design radiant floor heating in HeatAlgo - a step-by-step guide

Radiant floor layout tool and calculator in one: upload a floor plan, draw loops yourself or with Algo AI, connect the manifold and download the PDFs.

Guides

How to send the client form and get complete data - a step-by-step guide

How to send the client form in HeatAlgo, from creating the project to accepting your client's data - step by step, screen by screen, no jargon.

Guides

Algo AI assistant in HeatAlgo: what it does, where to find it and its limits

The Algo AI assistant in HeatAlgo: where to open it, how it reads building plans and reviews a project, its two modes, undo, sources and the monthly limit.

Guides

What water temperature does radiant floor heating need? Btu per square foot by floor covering

Radiant floor heat pump or boiler: at 95 °F supply water and 6-inch spacing a slab gives 13.3 Btu/h·ft² under tile, 12.4 under wood, 11.1 under carpet.

Guides

Radiant floor heating layout: tubing spacing on center, and how long a loop can be

Radiant floor heating layout: the area ÷ spacing rule skips the leaders. At 6 in on center it came up 41.7 ft short on one 138 sq ft room.

Guides

Oversized heat pump: why it short cycles and what that costs you

Heat pump short cycling: why a unit 2x too big for the house starts and stops all season, what that costs in efficiency and wear, and how to check the size.

Guides

Radiant floor heating design guide: what a layout should include and how to check one

Radiant floor heating design guide: check room loads, loop schedule and supply water temperature, with a worked 8-loop example in Btu/h, ft and gpm.

Guides

Retrofitting radiant floor heat in an older house: what to measure before you choose a system

Retrofit radiant floor heating: staple-up, panels on top, a thin slab or grooves in a slab. Measure door, threshold and stair heights and room heat loss first.

Guides

Where to put a radiant floor heating manifold: basement, closet or one per floor?

Where to put a radiant floor heating manifold: one floor, two positions, and 115.5 ft less tubing in the leaders when it moved to the middle of the hall.

Put room-by-room results behind your heating decision.

Prepare a report for $32. One payment unlocks every module for your house.

Create an account, add your building data, then buy the report in the app. 7 days of edits and downloads from each module's first download.