Update: data travels between modules, and the app has a new layout

Heat load calculations and the client form now feed every module, the app has a new layout, and supply runs can cross heated rooms - what's new in HeatAlgo.

Przemysław Paziewski

Founder of HeatAlgo

The first August batch, and the biggest since leaving beta in terms of how much work you stop doing twice. The heat load calculation and the client form have become sources: any module can take data from them, show you exactly what changed, and let you decide what you accept. On top of that the app has a new layout, and the underfloor module finally has supply runs that behave the way a real installation does. Here is everything that changed.

New features

Shared data across modules

The heat load calculation and the client form are now data sources for all three modules. Previously this worked one way only, and only between heat loss and heat pump sizing - the client's questionnaire could not be used anywhere outside the form itself.

An entry screen, once per module. Opening a module you see three figures from the best available source, one sentence of explanation and one button. If a second source exists it appears underneath with its own figures and a "use this instead" button. Skipping is remembered, and the way back is always the module's gear icon.

A change window when a source moves. When the data in a source changes, each row shows you what it was, what it will become, and whether you had edited that particular value by hand. Rows you edited yourself arrive unticked - accepting a correction from the client is always a deliberate act. Import only adds and overwrites; it never deletes anything.

A gear section, separately for each module. A list of every source, its state, when something was last taken from it, and a way to re-import or restore a source you declined.

Two things the modules do deliberately rather than by oversight. A value the client was never asked for is not guessed at - an answer to a similar but different question will not be imported, and the entry screen tells you what cannot be carried over. And mixed systems, radiators plus underfloor, do not carry the supply temperature: the client declares the radiator loop (45-55 C), while underfloor runs behind a mixing set at around 30/25 C and derives its output from the mean water temperature. Carrying that number over would quietly flip rooms from a deficit to a surplus.

The heat load results screen the other modules draw their data from

A new app layout

One dark sidebar has replaced the old narrow rail and context column, and a first visit to the app now has its own dashboard instead of an empty screen. The project dashboard carries a progress bar that answers the question an installer actually asks on opening a project: what is left before this can go to the client. Progress counts only the modules you actually started in that project - a heat-loss-only project shows complete, not 33%.

The top bar stays, and gains a rule that orders it: what is on the left concerns this page, what is on the right concerns the app.

The new dark sidebar and start dashboard with its progress bar

Supply runs can cross rooms

In a Polish single-family house every supply run from a manifold in the hallway crosses at least one heated room on its way, and the cabinet itself usually stands in a room that has a loop of its own. The route tool treated both cases as impossible: a click inside a section ended the route there, so the first click in the corridor ended the supply run in the corridor.

Now a click inside a room places a waypoint, and you finish the route with an explicit gesture - a double click or the Enter key. The cabinet is tested before the section, so a manifold standing in a heated room can finally be picked as the start of a route.

An underfloor heating plan with loops, a manifold and supply runs

Underfloor heating on the free tier

The underfloor module has joined the model we described when the pricing changed: one room stays fully calculated - spacing, pipe length, flow - and that room does not change unless you delete it. The rest you see with their name and geometry, without the calculated values.

Let us be equally plain about this: the printable floor plan is now part of the paid report. It carries the most work - spacing and length can be read off it with a ruler - and until now it was the only export with no gate at all.

Two glossaries

The installer's glossary explains the terms the product assumes you know: heat load calculation, U, lambda, R, thermal bridges, n50, bivalent point, SCOP, heating curve. The client's glossary describes the documents the form asks for: floor plan, section, window and door schedule, energy performance certificate. Standard-bound definitions are taken from the calculating code, not from memory. Both are linked from the checklist, on both sides - yours and your client's.

A guide on heat pump sizing

The oversized heat pump is the first substantial article for the heat pump module. It draws the mechanism rather than the symptom: an inverter compressor has a modulation floor, and oversizing lifts that floor above the building's demand for most of the season - at which point the only way to deliver less heat is to stop.

Improvements

  • The entry screen stops sending you where you already are. An empty project showed the same sentence in underfloor and in pump sizing - "this project has no heat load calculation yet" - above a button leading to the heat load calculation, and it greeted you with the same sentence above a button that did nothing. A module with nowhere to point you now simply opens.
  • The TOTAL footer in underfloor folds away. On a project with 14 rooms it took 249 of the panel's 629 pixels and left four rooms visible. Folded, it keeps the one line that matters at a glance, and nine rooms are visible.
  • The pump wizard marks the step where something is wrong. The issues counter has stopped being permanently amber and now counts blockers too, not just warnings. A blocked project previously showed no marker at all.
  • A first visit no longer flashes an empty screen. Arriving from the registration confirmation link, you saw a bare start screen for about a second before the real content appeared.
  • The contact form on the site now reaches us directly. It previously went through an external US service the privacy policy never named by name - and through which one submission on 3 August reached nobody. Submissions now land in our own database, and IP addresses are stored only as a hash.

Fixes

  • The AI stopped mistaking a truncated reading for an unreadable document. When the model's answer ran into the length limit you were told the document could not be read - and asked to rescan a document that had in fact been read perfectly, at the cost of your quota. The answer length limit has more than doubled, so substantial documents now go through whole.
  • The printed floor plan tiles the drawing, not the whole scan. The export dialog counted pages from the drawn geometry while the print used the extent of the entire background - "Download floor plan" promised one sheet and delivered several, each offset from the preview.
  • A failed save stopped being silent. An autosave error in the heat load form showed nothing at all.
  • One failure, one message. Five actions showed their own message and had the global handler stack a raw technical second one on top.
  • No more "HTTP 500" in Polish. The global error notification now resolves messages instead of showing the server's raw text.
  • A subscriber has a way into their own billing page. The only route to it was the account badge in the sidebar.
  • The underfloor detail drawer no longer contradicts the list beside it. A loop in an uncalibrated room could claim "flow below 0.5 l/min" while that same loop's row in the panel said nothing.
  • An oversized file gets its own message. Module saves and floor plan uploads previously borrowed the checklist's sentence about form data being too large.

Questions about any of these changes?

Have a look at the help center or write to us straight from the app - the "?" button in the bottom-right corner, then "Contact us". We usually reply within 24 hours.

Have a question or feedback?

I reply personally - usually within 24 hours.

Blog

See also

Guides

What flow temperature for underfloor heating - and why it decides your pipe spacing

Water temperature and floor covering set a floor's output, not its area. Measured table: what 30, 35, 40 and 45 °C give per m² under tile, wood and carpet.

Guides

Electric underfloor heating loses its subsidy in 2027 - what stays in Czyste Powietrze

From 2027 the programme funds no heating mats, electric boilers, electric radiators or electric underfloor heating. What stays on the list, and what it changes.

Guides

Pipe spacing and loop length in underfloor heating - how to work it out properly

The (area ÷ spacing) × 1.1 formula counts neither the run to the manifold nor the setback from the walls. Here is how far off it is, and how to measure a loop from real geometry.

Guides

Split heat pump ban 2027: what leaves the market, and what stays

No, an installed heat pump does not have to be replaced. From 1 January 2027 split air-to-water units up to 12 kW on GWP 150 or more leave the market.

Guides

The oversized heat pump - why a capacity margin is billed to the client every month

Why a heat pump sized "with a margin" cycles, loses seasonal efficiency and wears its compressor faster - and how to size one from a calculation, not a rule of thumb.

Guides

Installer's glossary: heat load, U-value, lambda, thermal bridges

Heat load and equipment sizing terms explained: U-value, lambda, thermal resistance, thermal bridges, n50, bivalent point, SCOP and the heating curve.

Guides

A client's glossary: what the terms in your installer's form mean

Your installer is asking for floor plans, sections and a window schedule? Here is what each of those documents is, why it is needed and where to find it.

Releases

Update: no more countdown - you pay only for the finished report

The 14-day trial is gone. Your HeatAlgo account is free forever - you pay only when you need the finished report - what's new in HeatAlgo.

Guides

What a heat load calculation is, and what actually depends on it

What a heat load calculation to EN 12831-1 is, what depends on it - from pump capacity to radiator supply temperature - and why a rule of thumb is not.

Releases

Update: pump sizing straight from the heat load calculation

The pump module now reads the project's heat load calculation directly - no imported copies, a per-room loss breakdown, and the full reasoning behind the selected capacity.

Releases

Update: a new generation of underfloor heating drawings

Spiral and meanders drawn like a working design, consistent rules for any room shape, and editable loop nodes - what's new in HeatAlgo.

Releases

Update: AI fills in project data from building documents

AI reads the building design, window schedule and energy certificate, and you approve the data into the heat load form - what's new in HeatAlgo.

Guides

How to use the underfloor heating module - a step-by-step guide

From a floor plan to a ready underfloor-heating loop layout with hydraulics - the complete guide to HeatAlgo's underfloor heating module.

Releases

Update: better underfloor heating design and in-app help

A smoother underfloor heating design workflow, in-app help, a help center and multiple storeys in one project - what's new in HeatAlgo.

News

HeatAlgo leaves beta: AI features and accounts with a 14-day trial

A year of beta with installers, the AI client form, notifications and heat load + underfloor heating improvements. What changes for your account and why now.

Guides

How to send a client the form and get complete data - a guide

From creating the project to accepting the client's data - a simple step-by-step guide, screen by screen, no jargon.